Skip to content
Started 1 yr 6 mo ago
Took 7 min 11 sec on reynolds
Failed

#271 (Sep 29, 2022, 12:46:20 PM)

No changes.

Started by upstream project CE_gpfit_Push_unit_tests build number 144
originally caused by:

Revision: 90c91cc6b980b44bedaf87ad004654b67a11431c
Repository: https://github.com/convexengineering/gassolar
  • refs/remotes/origin/master
SCM: git https://github.com/convexengineering/gassolar
  • Commits since last build: 0
  • Latest commit: 90c91cc
Test Result (8 failures / ±0)
Configuration Matrixcvxoptmosek
macys_VM
reynolds
windows10x64