projectroot.test.system.Solve2D_Coupled4x4_IBL_Panel_NACA0004_FittedTransition_TwoLayerNewton_btest_memcheck (from CTest)

Took 24 min.

Standard Output

Running 2 test cases...
qinf = 1.57387
Completed setting up grid.  Elapsed time : 2.11775 s

Transition front cannot be found within an element. Need to look into element interfaces.

# of natural transition points within elements = 0

Transition front cannot be found at element interfaces.

# of natural transition points at element interfaces = 0
Completed initializing IBL solution.  Elapsed time : 2.9559779979999998 s
Completed setting up IBL AES.  Elapsed time : 3.3102662829999998 s
Completed setting up panel AES.  Elapsed time : 86.2014574420000059 s
Completed setting up auxv AES.  Elapsed time : 86.2215098329999989 s
Completed setting up auxi AES.  Elapsed time : 86.2724717469999973 s
Completed setting up global AES.  Elapsed time : 86.2978084899999942 s
Starting solution.  Elapsed time : 86.3306500860000057 s
Completed pre-solving panel.  Elapsed time : 87.9302 s
Completed pre-solving auxv eqns.  Elapsed time : 89.5768 s
Starting test-solving linear system.  Elapsed time : 89.5773 s
Completed pre-checki...