Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.

Passed

projectroot.test.system.Solve2D_Coupled4x4_IBL_Panel_NACA0004_FittedTransition_TwoLayerNewton_btest_memcheck (from CTest)

Took 27 min.

Standard Output

Running 2 test cases...
qinf = 1.57387
Completed setting up grid.  Elapsed time : 1.90178 s

Transition front cannot be found within an element. Need to look into element interfaces.

# of natural transition points within elements = 0

Transition front cannot be found at element interfaces.

# of natural transition points at element interfaces = 0
Completed initializing IBL solution.  Elapsed time : 2.5891053369999999 s
Completed setting up IBL AES.  Elapsed time : 3.0391315620000001 s
Completed setting up panel AES.  Elapsed time : 126.5625346789999952 s
Completed setting up auxv AES.  Elapsed time : 126.5890391829999970 s
Completed setting up auxi AES.  Elapsed time : 126.6394160290000030 s
Completed setting up global AES.  Elapsed time : 126.6637133650000067 s
Starting solution.  Elapsed time : 126.7043277530000012 s
Completed pre-solving panel.  Elapsed time : 127.606 s
Completed pre-solving auxv eqns.  Elapsed time : 130.416 s
Starting test-solving linear system.  Elapsed time : 130.416 s
Completed pre-c...
The rest of the test output was removed since it exceeds the threshold of 1024 bytes.