Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.

Passed

projectroot.test.system.Solve2D_Coupled4x4_IBLSplitAmpLag_CorrelationClosure_CapturedTransition_PTC_btest_memcheck (from CTest)

Took 1 min 59 sec.

Standard Output

Running 2 test cases...
Re = 1.000000e+05, Mach = 0.000000e+00, qinf = 1.573869e+00
Completed setting up grid.  Elapsed time : 2.376799e+00 s
Completed initializing IBL solution.  Elapsed time : 2.71838 s
Completed setting up IBL AES.  Elapsed time : 3.23134 s
Completed setting up panel AES.  Elapsed time : 23.4885 s
Completed setting up auxv AES.  Elapsed time : 23.5177 s
Completed setting up auxi AES.  Elapsed time : 23.5275 s
Completed setting up global AES.  Elapsed time : 23.548 s
Starting solution.  Elapsed time : 23.6228 s
Non-zero time : 0.0568852 second(s)
Symbolic factor time : 0.107487 second(s)
Jacobian time : 0.0350832 second(s)
Numeric factor time : 0.196868 second(s)
UMFPACK solve time : 0.0612904 second(s)
Completed pre-solving panel.  Elapsed time : 24.3887 s
Non-zero time : 0.0506455 second(s)
Symbolic factor time : 0.030384 second(s)
Jacobian time : 0.0388068 second(s)
Numeric factor time : 0.161004 second(s)
UMFPACK solve time : 0.02069 second(s)
Completed pre-solving auxv eqns.  Elapsed t...
The rest of the test output was removed since it exceeds the threshold of 1024 bytes.