Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.

Passed

projectroot.test.system.Solve2D_Coupled4x4_IBL_Panel_NACA0004_FittedTransition_TwoLayerNewton_btest_memcheck (from CTest)

Took 3 min 41 sec.

Standard Output

Running 2 test cases...
qinf = 1.57387
Completed setting up grid.  Elapsed time : 1.41221 s
# of natural transition points within elements = 0

Transition front cannot be found within an element. Need to look into element interfaces.


Transition front cannot be found at element interfaces.

# of natural transition points at element interfaces = 0
Completed initializing IBL solution.  Elapsed time : 1.7421828930000001 s
Completed setting up IBL AES.  Elapsed time : 1.8985446269999999 s
Completed setting up panel AES.  Elapsed time : 11.2920447500000005 s
Completed setting up auxv AES.  Elapsed time : 11.3057646680000001 s
Completed setting up auxi AES.  Elapsed time : 11.3135402000000003 s
Completed setting up global AES.  Elapsed time : 11.3164280949999991 s
Starting solution.  Elapsed time : 11.3581262400000007 s
Completed pre-solving panel.  Elapsed time : 11.7587 s
Completed pre-solving auxv eqns.  Elapsed time : 12.224 s
Starting test-solving linear system.  Elapsed time : 12.2246 s
Completed pre-checkin...
The rest of the test output was removed since it exceeds the threshold of 1024 bytes.