Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.

Passed

projectroot.test.system.Solve2D_Coupled4x4_IBL_Panel_NACA0004_FittedTransition_TwoLayerNewton_btest_memcheck (from CTest)

Took 9 min 38 sec.

Standard Output

Running 2 test cases...
qinf = 1.57387
Completed setting up grid.  Elapsed time : 1.9839 s
# of natural transition points within elements = 0

Transition front cannot be found within an element. Need to look into element interfaces.


Transition front cannot be found at element interfaces.

# of natural transition points at element interfaces = 0
Completed initializing IBL solution.  Elapsed time : 2.6585816320000002 s
Completed setting up IBL AES.  Elapsed time : 2.8313211049999998 s
Completed setting up panel AES.  Elapsed time : 27.1913149850000018 s
Completed setting up auxv AES.  Elapsed time : 27.2094355559999990 s
Completed setting up auxi AES.  Elapsed time : 27.2198918710000015 s
Completed setting up global AES.  Elapsed time : 27.2242965099999985 s
Starting solution.  Elapsed time : 27.2712390760000005 s
Completed pre-solving panel.  Elapsed time : 28.0337 s
Completed pre-solving auxv eqns.  Elapsed time : 29.4015 s
Starting test-solving linear system.  Elapsed time : 29.402 s
Completed pre-checking...
The rest of the test output was removed since it exceeds the threshold of 1024 bytes.