Skip to content

Passed

projectroot.test.system.Solve2D_Coupled4x4_IBLUniField_Panel_NACA0004_CapturedTransition_btest_memcheck (from CTest)

Took 20 min.

Standard Output

Running 2 test cases...
Completed setting up grid.  Elapsed time : 1.40535 s
Completed initializing IBL solution.  Elapsed time : 1.782 s
Completed setting up IBL AES.  Elapsed time : 2.10816 s
Completed setting up panel AES.  Elapsed time : 84.5436 s
Completed setting up auxv AES.  Elapsed time : 84.578 s
Completed setting up auxi AES.  Elapsed time : 84.6339 s
Completed setting up global AES.  Elapsed time : 84.6668 s
Starting solution.  Elapsed time : 84.7177 s
Completed pre-solving panel.  Elapsed time : 85.5476 s
Completed pre-solving auxv eqns.  Elapsed time : 87.2665 s
Starting test-solving linear system.  Elapsed time : 87.267 s
Completed pre-checking linear solver.  Elapsed time : 175.106 s
Start solving global nonlinear system.  Elapsed time : 175.119 s
Use extreme caution: the parameter ntcrit_ is being changed from 2 to 2
Total runtime for current ntcrit: 1202.33 s

*** No errors detected