Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.

Passed

projectroot.test.system.Solve2D_Coupled4x4_IBLSplitAmpLag_CorrelationClosure_CapturedTransition_PTC_btest_memcheck (from CTest)

Took 1 min 44 sec.

Standard Output

Running 2 test cases...
Re = 1.000000e+05, Mach = 0.000000e+00, qinf = 1.573869e+00
Completed setting up grid.  Elapsed time : 2.282628e+00 s
Completed initializing IBL solution.  Elapsed time : 2.68472 s
Completed setting up IBL AES.  Elapsed time : 3.03513 s
Completed setting up panel AES.  Elapsed time : 20.3063 s
Completed setting up auxv AES.  Elapsed time : 20.3208 s
Completed setting up auxi AES.  Elapsed time : 20.333 s
Completed setting up global AES.  Elapsed time : 20.3374 s
Starting solution.  Elapsed time : 20.4063 s
Non-zero time : 0.0714136 second(s)
Symbolic factor time : 0.110692 second(s)
Jacobian time : 0.0278366 second(s)
Numeric factor time : 0.208373 second(s)
UMFPACK solve time : 0.0353643 second(s)
Completed pre-solving panel.  Elapsed time : 21.0904 s
Non-zero time : 0.0418663 second(s)
Symbolic factor time : 0.037346 second(s)
Jacobian time : 0.0262502 second(s)
Numeric factor time : 0.0822113 second(s)
UMFPACK solve time : 0.00475578 second(s)
Completed pre-solving auxv eqns.  Elaps...
The rest of the test output was removed since it exceeds the threshold of 1024 bytes.