Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.

Passed

projectroot.test.unit.MOESS_SANS_Optimizer_TAO_btest_memcheck (from CTest)

Took 12 sec.

Standard Output

Running 4 test cases...
Running 4 test cases...
Running 4 test cases...
Running 4 test cases...


TAO SANS optimizing metrics
TAO SANS optimizing metrics



TAO SANS optimizing metrics


TAO SANS optimizing metrics

Implied Metric Calculation
Implied Metric Calculation
Implied Metric Calculation
 Time           : 0.121404 s
 Time           : 0.121214 s
 Implied Cost   : 8
 Implied Cost   : 8
 Actual Cost    : 8
 Actual Cost    : 8
 Mean, Min, Max Quality   : 1, 1, 1
 Mean, Min, Max Quality   : 1, 1, 1
 Time           : 0.119242 s
 Implied Cost   : 8
 Actual Cost    : 8
Implied Metric Calculation
 Mean, Min, Max Quality   : 1, 1, 1

------------------------------------------

------------------------------------------
Initial cost estimate : 8.000e+00
Initial cost estimate : 8.000e+00
 Time           : 0.125842 s
Available cost range  : 4.757e+00 - 1.073e+01
Available cost range  : 4.757e+00 - 1.073e+01
Requested target cost : 1.600e+01
Adjusted target cost  : 1.073e+01
Requested target cost : 1.600e+01
Update...
The rest of the test output was removed since it exceeds the threshold of 1024 bytes.