Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.

Passed

projectroot.test.system.Solve2D_Coupled4x4_IBL_Panel_NACA0004_FittedTransition_TwoLayerNewton_btest_memcheck (from CTest)

Took 2 min 55 sec.

Standard Output

Running 2 test cases...
qinf = 1.57387
Completed setting up grid.  Elapsed time : 0.96523 s
# of natural transition points within elements = 0

Transition front cannot be found within an element. Need to look into element interfaces.


Transition front cannot be found at element interfaces.

# of natural transition points at element interfaces = 0
Completed initializing IBL solution.  Elapsed time : 1.1450122680000001 s
Completed setting up IBL AES.  Elapsed time : 1.2348509320000001 s
Completed setting up panel AES.  Elapsed time : 8.6592557130000003 s
Completed setting up auxv AES.  Elapsed time : 8.6655498410000007 s
Completed setting up auxi AES.  Elapsed time : 8.6711246079999995 s
Completed setting up global AES.  Elapsed time : 8.6735618950000006 s
Starting solution.  Elapsed time : 8.6984652590000007 s
Completed pre-solving panel.  Elapsed time : 8.96239 s
Completed pre-solving auxv eqns.  Elapsed time : 9.31098 s
Starting test-solving linear system.  Elapsed time : 9.31131 s
Completed pre-checking li...
The rest of the test output was removed since it exceeds the threshold of 1024 bytes.