Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.

Test Result : TestGP_mosek_cli

0 failures (±0)
18 tests (±0)
Took 22 sec.

All Tests

Test nameDurationStatus
test_6010.33 secPassed
test_additive_constants0.25 secPassed
test_constants_in_objective_10.21 secPassed
test_constants_in_objective_20.2 secPassed
test_cost_freeing0.62 secPassed
test_dup_eq_constraint0.65 secPassed
test_exps_is_tuple0.2 secPassed
test_mdd_example0.7 secPassed
test_no_monomial_constraints0.41 secPassed
test_posy_simplification8 msPassed
test_sensitivities0.17 secPassed
test_sigeq16 secPassed
test_simple_united_gp0.22 secPassed
test_singular0.33 secPassed
test_terminating_constant_0.23 secPassed
test_trivial_gp0.5 secPassed
test_trivial_vector_gp1 secPassed
test_zeroing0.15 secPassed