Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.

Test Result

0 failures (±0)
110 tests (+1)
Took 6 hr 53 min.

All Tests

PackageDurationFail(diff)Skip(diff)Pass(diff)Total(diff)
projectroot.test6 hr 53 min00110+1110+1