Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.

Passed

projectroot.test.system.Solve2D_Coupled4x4_IBL_Panel_NACA0004_FittedTransition_TwoLayerNewton_btest_memcheck (from CTest)

Took 22 min.

Standard Output

Running 2 test cases...
qinf = 1.57387
Completed setting up grid.  Elapsed time : 1.29164 s
# of natural transition points within elements = 0

Transition front cannot be found within an element. Need to look into element interfaces.


Transition front cannot be found at element interfaces.

# of natural transition points at element interfaces = 0
Completed initializing IBL solution.  Elapsed time : 2.0165188569999999 s
Completed setting up IBL AES.  Elapsed time : 2.3436432049999998 s
Completed setting up panel AES.  Elapsed time : 79.5449673229999945 s
Completed setting up auxv AES.  Elapsed time : 79.5640586899999960 s
Completed setting up auxi AES.  Elapsed time : 79.6124426290000002 s
Completed setting up global AES.  Elapsed time : 79.6367029689999981 s
Starting solution.  Elapsed time : 79.6683908840000043 s
Completed pre-solving panel.  Elapsed time : 80.9648 s
Completed pre-solving auxv eqns.  Elapsed time : 82.5703 s
Starting test-solving linear system.  Elapsed time : 82.5708 s
Completed pre-checki...
The rest of the test output was removed since it exceeds the threshold of 1024 bytes.