Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.

Passed

projectroot.test.system.Solve2D_Coupled4x4_IBL_Panel_NACA0004_FittedTransition_TwoLayerNewton_btest_memcheck (from CTest)

Took 20 min.

Standard Output

Running 2 test cases...
qinf = 1.57387
Completed setting up grid.  Elapsed time : 1.64085 s
# of natural transition points within elements = 0

Transition front cannot be found within an element. Need to look into element interfaces.


Transition front cannot be found at element interfaces.

# of natural transition points at element interfaces = 0
Completed initializing IBL solution.  Elapsed time : 2.1790855620000000 s
Completed setting up IBL AES.  Elapsed time : 2.5113684930000000 s
Completed setting up panel AES.  Elapsed time : 86.8188818050000037 s
Completed setting up auxv AES.  Elapsed time : 86.8372037099999972 s
Completed setting up auxi AES.  Elapsed time : 86.8820058339999974 s
Completed setting up global AES.  Elapsed time : 86.9023022230000066 s
Starting solution.  Elapsed time : 86.9380138519999974 s
Completed pre-solving panel.  Elapsed time : 87.6761 s
Completed pre-solving auxv eqns.  Elapsed time : 89.4201 s
Starting test-solving linear system.  Elapsed time : 89.4206 s
Completed pre-checki...
The rest of the test output was removed since it exceeds the threshold of 1024 bytes.