Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.

Passed

projectroot.test.unit.MOESS_PX_Optimizer_NLOPT_btest_memcheck (from CTest)

Took 11 sec.

Standard Output

Running 5 test cases...
Running 5 test cases...
Running 5 test cases...
Running 5 test cases...


NLopt PX optimizing metrics serially on host: reynolds
NLopt PX optimizing metrics serially on host: reynolds



NLopt PX optimizing metrics serially on host: reynolds


NLopt PX optimizing metrics serially on host: reynolds

Implied Metric Calculation
Implied Metric Calculation
 Time           : 0.0964048 s
 Time           : 0.0969887 s
 Implied Cost   : 8
 Implied Cost   : 8
 Actual Cost    : 8
 Actual Cost    : 8
 Mean, Min, Max Quality   : 1, 1, 1
 Mean, Min, Max Quality   : 1, 1, 1
Initial cost estimate = 8.000e+00
Initial cost estimate = 8.000e+00
Implied Metric Calculation

---------------------------
Starting NLopt Optimization

---------------------------

---------------------------
Starting NLopt Optimization
---------------------------

 Time           : 0.100557 s
Implied Metric Calculation
 Implied Cost   : 8
 Actual Cost    : 8
 Mean, Min, Max Quality   : 1, 1, 1
 Time           : 0.101622 s
 Impli...
The rest of the test output was removed since it exceeds the threshold of 1024 bytes.